Certified supervision • Independent control

Construction supervision in the client's interest.

I review workmanship, design compliance, materials, concealed works, completed quantities and documentation. The objective is to identify issues before they are covered, paid for or become costly rework.

Māris Cīrulis · cert. No. 4-03064Quality · quantities · documentation · risksPhotographs from sites supervised by Māris Cīrulis.
4-03064Construction supervisor and site manager certificate
25 yearsExperience in construction and project control
IndependentI do not build or sell materials — I control
LVProjects in Riga and across Latvia

Scope of control

What I inspect during construction

The supervision scope is adapted to the project. Below are the main control areas where mistakes typically create the greatest client risk.

Quality and design compliance

Checking actual execution against drawings, details, specifications and approved solutions.

Construction products and materials

Material compliance with the design, manufacturer documentation and installation requirements.

Concealed and critical works

Inspection before works are concealed, while defects can still be corrected efficiently and economically.

Completed quantities and payments

Comparing actual completed works and quantities with the estimate, completion records and contractor payment requests.

Defects and non-conformities

Early recording of defects with photos, written description, priority and required corrective action.

Documentation and handover readiness

Control of execution documents, inspection records and handover readiness according to project-specific requirements.

3D model of timber frame structures used to check connections and openings
Reviewing the structural model before production. Connections, openings and structural solutions are checked in the model before the elements go into production. An error found at this stage costs the client nothing — the same error on site means rework and a delay.

When control matters most

Critical moments when inspection should not be delayed

01

Before works start

Design, estimate, scope and principal risks.

02

Before concealment

Reinforcement, waterproofing, services and structural details.

03

Before payment

Whether the requested payment matches actual completion.

04

Before the next stage

Whether previous defects are closed before proceeding.

05

Before handover

Defect list, documentation and completion review.

For the client

What you receive after a site visit

  • Photo record of material findings
  • Written list of non-conformities, risks and actions required
  • Priorities — what must be corrected now and what may proceed
  • Follow-up control of previously recorded defects

Independence principle

I do not build. I control.

In my working model, the supervisor does not represent the contractor's technical or financial interest. The control point is the client's risk — quality, cost, schedule and documented result.

  • Independent quality assessment
  • Timely escalation of issues to the client
  • Fact- and document-based communication

Supervision pricing

Service scope by project risk and control intensity

The pricing structure follows the main website. A precise offer is prepared after reviewing the project, construction stage and required visit frequency.

BASIC
Project up to EUR 150,000
€250
/ visit · VAT not applicable
  • Site inspection and risk recording
  • Progress assessment
  • Written summary to the client
Enquire
PREMIUM+
Project above EUR 500,001
from €800
/ visit · VAT not applicable
  • Everything in STANDARD
  • Coordination meeting with decision-makers
  • Progress, schedule and risk summary
  • Decision log with deadlines
Enquire

Price may vary depending on location, construction stage, visit duration and documentation volume. Scope and price are agreed before work starts.

How it works

From document review to regular control

1. InputsDesign, estimate, contracts, construction stage.
2. Risk pointsI identify what needs checking and when.
3. Site visitInspection, measurements as required, photos.
4. FindingsWritten actions, priorities and responsible parties.
5. Follow-upI verify that recorded non-conformities are closed.

Māris Cīrulis

Civil engineer · certified construction specialist

25 years of experience in construction, supervision, estimating, scheduling and project control.

Certificate No. 4-03064CĪRULIS PROJEKTU KONTROLE

Why a dedicated supervision page

Construction supervision is a distinct service. This page clearly explains what is controlled, when to involve the supervisor, what the client receives after inspections and how the service is priced. It separates supervision from estimating, technical inspections and pre-purchase reviews.

Contact

Send project information

To prepare a specific offer, I need the site location, construction stage, project documents and desired inspection frequency.